YOUR SOLAR.
YOUR GENERATOR.
ONE BRAIN.

We make your power sources work together — automatically.

0+

Projects

0MW+

Controlled

0+

Inverter Brands

0+

Years Active

Load shedding hit 10 hours yesterday. Your generator just burned PKR 80,000 in diesel.

Most industrial facilities in Pakistan are running three power sources — WAPDA, solar, and a genset — with zero coordination between them. The result: wasted fuel, inverter trips, manual intervention at 2am, and money evaporating.

We fix that. Automatically.

WITHOUT ASYNC ENERGY

WAPDA

Solar

Genset

↗↙↗

Wasted fuel. Manual switching. No data.

WITH ASYNC ENERGY

WAPDA

Solar

Genset

↓↓↓

Async Energy Controller

Automated. Balanced. Monitored.

From site visit to live system — in days, not months.

STEP 1FREE

Site Assessment

We visit, measure, log your current setup.

STEP 248hrs

System Design

Custom config for your exact load profile.

STEP 31–3 days

Installation

Our engineers wire, mount, commission.

STEP 4Forever

Live & Monitored

Dashboard live, alerts active, you go home.

Already have Huawei? Sungrow? GoodWe? We connect to it.

Huawei
Sungrow
Solis
Growatt
GoodWe
Fronius
SMA
Schneider
Huawei
Sungrow
Solis
Growatt
GoodWe
Fronius
SMA
Schneider

Don't see your brand? We've likely integrated it. Ask us.

Real installations. Real results.

From 60kW rooftops to 500kVA industrial powerhouses — every project commissioned by our own engineers.

TEXTILE

400kW Huawei + 500kVA Cummins Hybrid System

Faisalabad

400kW Solar|500kVA Genset

Diesel consumption reduced by ~38%

Complete hybrid energy system for a 24/7 textile dyeing unit. Solar handles 60% of daytime load. Generator kicks in only when needed — automatically.

HOSPITAL

250kW Sungrow + 320kVA CAT Uninterrupted Power

Lahore

250kW Solar|320kVA Genset

Zero downtime since installation

Private hospital running critical care units on automated solar-genset hybrid. SCADA monitoring provides real-time visibility for facility management.

EDUCATION

300kW GoodWe Campus Solar Integration

Islamabad

300kW Solar|400kVA Genset

Energy costs cut by 42%

University campus with multiple buildings integrated into a single hybrid system. Zero export ensures no WAPDA complications.

We let the results do the talking.

The system paid for itself in fuel savings within 9 months. We haven't manually touched the generator controls since installation.

Plant Manager

Textile Mill, Faisalabad

Load shedding used to mean production loss. Now the solar and generator handoff is seamless — we don't even notice the WAPDA cuts anymore.

Operations Director

Hospital, Lahore

Their SCADA system gives us visibility we never had. We can see every kilowatt across three campuses from a single screen. Game changer.

Facilities Head

University, Islamabad

Stop burning diesel. Start letting the system think.

Get a free site assessment from our engineers.
No commitment. Just clarity.

Questions? We've answered them.

Chat with us on WhatsApp