PV-DG SYNC CONTROLLER

Solar + generator, automatically balanced.

Stop the midnight generator trips. Stop the manual switching. Our PV-DG Controller reads your solar output in real time and tells your generator exactly when to step in — and when to back off.

HERE'S WHAT MOST FACILITIES ARE DEALING WITH

The problem is real — and expensive.

  • Solar shuts down when WAPDA fails — inverter trips, production stops

  • Generator runs at full load even when solar could handle 60% of it

  • Someone manually monitors the board and switches sources by hand

  • No data. No logs. No visibility.

WHAT WE DO ABOUT IT

The solution: automated, intelligent control.

Real-time power balancing

Fuel savings of 30–50%

Zero export limitation

Grid compliance without net metering

Automatic generator start/stop

No manual intervention, ever

Remote monitoring via dashboard

Know your system's status from your phone

Supports all major inverter brands

Works with what you already have

Built for real-world industrial environments.

Input SourcesGrid | Solar | Generator
OutputCoordinated power flow signals
MonitoringV, I, PF, Hz, kW, kWh
IntegrationLAN, RS485 Modbus, optional cloud
Compatible InvertersHuawei, Sungrow, Growatt, GoodWe, Solis, Fronius, SMA, Schneider
Panel MountingStandard DIN rail enclosure

Compatible Energy Analyzers

FICOCircutorJanitzaLovatoSchneiderSICESDeep SeacomAp

Built for Pakistan's power-critical industries.

Textile mills and dyeing units

Hospitals and private clinics

Cold storage facilities

Educational institutions

Commercial plazas and offices

Poultry and dairy farms

See it in action.

TEXTILE

400kW Huawei + 500kVA Cummins Hybrid System

Faisalabad

400kW Solar|500kVA Genset

Diesel consumption reduced by ~38%

Complete hybrid energy system for a 24/7 textile dyeing unit. Solar handles 60% of daytime load. Generator kicks in only when needed — automatically.

HOSPITAL

250kW Sungrow + 320kVA CAT Uninterrupted Power

Lahore

250kW Solar|320kVA Genset

Zero downtime since installation

Private hospital running critical care units on automated solar-genset hybrid. SCADA monitoring provides real-time visibility for facility management.

EDUCATION

300kW GoodWe Campus Solar Integration

Islamabad

300kW Solar|400kVA Genset

Energy costs cut by 42%

University campus with multiple buildings integrated into a single hybrid system. Zero export ensures no WAPDA complications.

Ready to stop babysitting your power system?

Chat with us on WhatsApp