ELUM ENERGY CONTROLLER
Advanced hybrid controller for complex solar + generator + grid setups.
For sites that need more than basic PV Diesel Generator coordination — complex multi-source setups, advanced load management, and real-time optimization across your entire power ecosystem. The Elum energy controller provides advanced hybrid control logic for demanding industrial environments with deep integration to inverters, SCADA, and BMS systems.
HERE'S WHAT MOST FACILITIES ARE DEALING WITH
The problem is real — and expensive.
Complex multi-source setups need advanced control logic
Basic controllers can't handle sophisticated load profiles
Need integration with existing SCADA or BMS systems
Demanding industrial environments require robust solutions
WHAT WE DO ABOUT IT
The solution: automated, intelligent control.
Advanced hybrid control logic
→ Optimized for complex multi-source solar-dg-grid setups
Deep inverter integration
→ Native protocol support for Huawei, Sungrow, Growatt, GoodWe
SCADA/BMS integration ready
→ Fits into existing automation systems seamlessly
Predictive energy management
→ AI-driven optimization for peak efficiency and fuel savings
Zero export built-in
→ Advanced zero export controller functionality included
Built for real-world industrial environments.
Built for Pakistan's power-critical industries.
Large-scale industrial complexes
Multi-megawatt solar installations
Critical infrastructure facilities
Complex commercial buildings
Hybrid microgrids and energy parks
Remote industrial operations
See it in action.
400kW Huawei + 500kVA Cummins Hybrid System
Faisalabad
Diesel consumption reduced by ~38%
Complete hybrid energy system for a 24/7 textile dyeing unit. Solar handles 60% of daytime load. Generator kicks in only when needed — automatically.
250kW Sungrow + 320kVA CAT Uninterrupted Power
Lahore
Zero downtime since installation
Private hospital running critical care units on automated solar-genset hybrid. SCADA monitoring provides real-time visibility for facility management.
300kW GoodWe Campus Solar Integration
Islamabad
Energy costs cut by 42%
University campus with multiple buildings integrated into a single hybrid system. Zero export ensures no WAPDA complications.